Site under construction — additional project content and documentation will be added.
Selected technical portfolio

I bring complex experimental systems from hardware to operation.

Hands-on construction, integration, startup, testing, troubleshooting and operations across accelerator-driven nuclear and particle-physics systems at Los Alamos National Laboratory.

T. J. Schaub working inside the CCM detector
Published project image: T. J. Schaub replacing a photomultiplier tube during a CCM detector upgrade.
Where the work happened
Annotated aerial view of LANSCE showing the Lujan Center and UCN facility
Facility overview

Los Alamos Neutron Science Center — LANSCE

800 MeV proton accelerator complex feeding multiple experimental facilities. My work represented here spans the Lujan Center / CCM program and the UCN experimental facility.

Lujan CenterCCM200UCN FacilitynEDM
Lujan Center

Lujan Center Experimental Area ER1

3D model of the Lujan Center and surrounding Target 1 area
Lujan Center Experimental Area ER1 overview showing the Proton Storage Ring, Target 1, Line D, ER-2 and CCM

At Target 1, stopped π⁺ decay at rest produces prompt monoenergetic 29.8 MeV muon neutrinos. CCM200 used this accelerator source.

  • Coherent CAPTAIN-Mills / CCM200
  • Target 1 / stopped-pion neutrino source
  • Neighboring neutron flight paths and instruments
UCN FACILITY

UCN Experimental Area B

CAD overview of UCN Area B showing the source, beamlines and experiments

The Area B source converts spallation neutrons in cryogenic solid deuterium into ultracold neutrons with energies below about 300 neV (typically on the order of 100 neV), slow enough to guide, polarize and store for precision neutron experiments.

  • LANL nEDM experiment
  • UCNτ experiment
  • UCNA / UCNB experimental area
  • UCN source, beamlines and supporting vacuum / cryogenic systems
Individual projects & systems

From facility scale down to the hardware

These pages go deeper into what each experiment or facility does, the physics or measurement it supports, and the specific systems I built, integrated, commissioned, operated or supported.

Commissioning approach

From individual hardware to integrated operation

Construction
Integration
Startup
Functional Testing
Operations
My strongest work has typically been at the interfaces: tracing what was actually installed, understanding how subsystems interact, instrumenting behavior, isolating faults, coordinating changes and proving that the integrated system operates as intended.